国产精品福利自产拍在线观看,亚洲色无码专区在线观看精品,久久久亚洲欧洲日产国码农村,A级无遮挡超级高清-在线观看,学生被强奷到高潮喷水在线观看

龍佑機(jī)械 用心·專注·專心用質(zhì)量打造升降機(jī)械良心企業(yè)


全國咨詢熱線:150-6907-5995

龍佑升降機(jī)械
當(dāng)前位置:首頁 » 遼寧升降機(jī)的安裝技巧解讀

遼寧升降機(jī)的安裝技巧解讀

文章出處:www.adiosmanchas.com 責(zé)任編輯:admin 人氣:1687 發(fā)表時間:2016-09-06 17:12:09

遼寧升降機(jī)所使用的調(diào)節(jié)閥在安裝時對環(huán)境及其它要求各有不同,這兒我們就來講講調(diào)節(jié)閥對遼寧升降機(jī)工作環(huán)境的要求及其安裝技巧。Liaoning elevator control valve used in the installation of the environment and other requirements of different, here we come to talk about the work environment of the Liaoning elevator to the requirements and installation skills.

1.調(diào)節(jié)閥屬于現(xiàn)場儀表,要求環(huán)境溫度應(yīng)在-25~60℃范圍,相對濕度≤95%。如果是安裝在露天或高溫場合,應(yīng)采取防水、降溫措施。在有震源的地方要遠(yuǎn)離振源或增加防振措施。The regulating valve belongs to the field instruments, requirements of environmental temperature should be at - 25 to 60 DEG C, relative humidity is less than 95%. If it is installed in the open air or high temperature, should be taken to water, cooling measures. In a place away from the local oscillator source or increase the anti vibration measures.

 

2.調(diào)節(jié)閥一般應(yīng)垂直安裝,特殊情況下可以傾斜,如傾斜角度很大或者閥本身自重太大時對閥應(yīng)增加支承件保護(hù)。Regulating valve generally should be installed vertically, special circumstances can be tilted, such as the tilt angle is large or the valve itself is too large when the valve should be added to support the protection of parts.

3.安裝調(diào)節(jié)閥的管道一般不要離地面或地板太高,在管道高度大于2m時應(yīng)盡量設(shè)置平臺,以利于操作手輪和便于進(jìn)行維修。Installation of the pipeline is generally not from the ground or floor too high, in the pipeline height of more than 2m should be set as far as possible platform, in order to facilitate the operation of the hand wheel and easy maintenance.

4.安裝前應(yīng)對管路進(jìn)行清洗,排除污物和焊渣。安裝后,為保證不使雜質(zhì)殘留在閥體內(nèi),還應(yīng)再次對遼寧升降機(jī)進(jìn)行清洗。Before installation, the pipeline should be cleaned to remove dirt and welding slag. After installation, in order to ensure that the impurities are not left in the body, but also to the Liaoning lift for cleaning.

5.在發(fā)生故障或維修的情況下使生產(chǎn)過程能繼續(xù)進(jìn)行,調(diào)節(jié)閥應(yīng)加旁通管路。In the event of failure or maintenance of the case so that the production process can continue to be adjusted, the valve should be added to the bypass line.

6.拆修后應(yīng)注意加油潤滑,低速電機(jī)一般不要拆洗加油。裝配后還應(yīng)檢查閥位與閥位開度指示是否相符。Overhaul should be noted that after lubrication, low-speed motor is generally not washable. Assembly should also check the valve position and valve position indication is consistent.

此文關(guān)鍵字:遼寧升降機(jī)

龍佑快訊新聞排行

升降機(jī)知識排行

升降機(jī)問答排行

国产精品福利自产拍在线观看,亚洲色无码专区在线观看精品,久久久亚洲欧洲日产国码农村,A级无遮挡超级高清-在线观看,学生被强奷到高潮喷水在线观看